ISTQB Advanced Test Management Glossary
Strategy, process improvement, and estimation at the level of a test manager rather than a tester.
69 terms in this topic
About this topic
Source: ISTQB Certified Tester Advanced Level Test Management (CTAL-TM)
Advanced Level test management covers the organisational and strategic side of testing — the concerns of a test manager rather than a tester. These terms extend well beyond the Foundation Level treatment of planning, monitoring, and risk.
Strategy operates at two levels. An organisational test strategy sets the approach across an organisation; project-level test approaches then tailor it. The syllabus names several strategy archetypes: analytical (driven by analysis, typically risk-based), model-based, methodical (following a checklist or standard set of conditions), process- or standard-compliant, reactive (responding to the system as encountered, as in exploratory testing), consultative, and regression-averse. Real programmes almost always blend several.
Test process improvement has its own established models. TMMi (Test Maturity Model Integration) and TPI Next assess and stage the maturity of a test process; the Critical Testing Processes model takes a different route by focusing on the processes that matter most in a given context. These sit alongside general process assessment and CMMI. Note that the formal distinction between process-reference and content-reference models belongs to the Expert Level Improving the Test Process syllabus rather than to Advanced Level Test Management.
Estimation and measurement deepen considerably. Wideband Delphi structures expert consensus; test point analysis derives effort from a functional size measure. Defect detection percentage measures escape rate, and a RACI matrix clarifies who is responsible, accountable, consulted, and informed for each activity.
Quality management widens the frame further — quality gates, quality debt, and total quality management address organisational quality rather than product testing alone, and the test manager is usually the person expected to speak to them.
What this topic covers
- Organisational test strategy
- Strategy archetypes
- TMMi, TPI Next and CTP
- Wideband Delphi and test point analysis
- RACI matrices and quality gates
- Test management roles
Terms in Advanced Test Management
Tap any term to read its full definition and examples.
69 terms
- a/b testing
- agile test leader
- agile test team leader
- analytical test strategy
- appraisal
- audit
- capability maturity model integration
- causal loop diagram
- consultative test strategy
- control chart
- cost of quality
- critical testing processes
- crowd testing
- defect density
- defect detection percentage
- defect management committee
- efqm model
- equivalent manual test effort
- failure mode
- failure rate
- independent test lab
- level test plan
- management review
- master test plan
- maturity
- mean time between failures
- mean time to failure
- mean time to repair
- methodical test strategy
- model-based test strategy
- organizational test strategy
- phase containment
- prisma
- process assessment
- process-compliant test strategy
- quality assistance
- quality coaching
- quality culture
- quality debt
- quality gate
- raci matrix
- reactive test strategy
- regression-averse test strategy
- reliability growth model
- remote test lab
- session-based test management
- smart goal methodology
- software process improvement
- standard-compliant test strategy
- systematic test and evaluation process
- test architect
- test automation engineer
- test automation manager
- test closure
- test director
- test histogram
- test leader
- test manager
- test maturity model integration
- test mission
- test point analysis
- test policy
- test process group
- test process improvement
- test process improvement manifesto
- testing capability
- total quality management
- tpi next
- wideband delphi
Test your knowledge with real ISTQB-style questions
Sit a full-length ISTQB CTFL practice test and see how well you’ve mastered this topic.
Or read questions with worked answers, or take a practice drill by chapter or K-level.